The diving tasks associated with this project included the removal of the blind flange adapter, the installation of the bell mouth & preparations of the pulling rope, the removal of the bell mouth, the installation of the articulated pipe flange adapter, and the installation of the 6m articulated pipe. Diving depths reached approximately 147 feet. All surveys and observations of pull-in were performed with ROV.