The diving tasks associated with this project included the removal of blind flange adapter, the installation of bell mouth & preparations of pulling rope, the removal of bell mouth, installation of articulated pipe flange adapter, and installation of 6m articulated pipe. Diving depths reached approximately 147 feet. All surveys and observations of pull-in were performed with ROV.