MSF NORFOLK- TYPE 6 REPAIR

Norfolk, VA

REPAIR

MSF NORFOLK- TYPE 6 REPAIR

Norfolk, VA

PROJECT DETAILS

PCCI awarded Precon Marine the contract for the magnetic silencing facility upgrades in Norfolk, VA.  The project consisted of deconstructing the existing underwater range and constructing a new one in its place. Contract also included hardening the system by installing all of the fiber optic cables in a duct bank consisting of 42 each 3” HDPE pipes. The entire duct bank was approximately 4500 feet long. The new range consisted of 13 EMTs and several MT sensors.