Completed repairs to the Transportation and Command Dock to restore this facility to its original design capacity. Repair work included removal of the concrete deck at selected locations to facilitate pile driving; driving piles; tying piles to the dock structure; expansion joint repairs; concrete spall repairs; and replacement of damaged secondary fender piles and their associated brackets.