by admin | Feb 14, 2025
YORK RIVER OYSTER REEF York River, VA UNDERWATER CONSTRUCTION York River, VA PROJECT DETAILS Transportation and deployment of approximately 8,500 tons of R4 rip rap stone and 30,000 tons of VDOT #1 crushed stone in the York River, Chesapeake Bay, Virginia, to...
by admin | Feb 14, 2025
USS WISCONSIN BERTHING DREDGING Norfolk, VA UNDERWATER CONSTRUCTION Norfolk, VA PROJECT DETAILS Within specified zones to allocated dredge depths, Precon’s dive team hand dredged underneath the USS Wisconsin Battleship located in Norfolk, VA, utilizing hydraulic...
by admin | Feb 14, 2025
CBBT REFURBISH FENDER PANELS Chesapeake Bay Bridge Tunnel, VA MARINE CONSTRUCTION Chesapeake Bay Bridge Tunnel, VA PROJECT DETAILS This project focused on replacing the fender system at the North Channel Bridge, part of the Chesapeake Bay Bridge Tunnel. The goal was...
by admin | Feb 14, 2025
HRCP CONVEYOR PILE CAPS Virginia MARINE CONSTRUCTION VIRGINIA PROJECT DETAILS Precon Marine installed the superstructure steel, the pile cap single & double supports, support stiffener plates, end platform, and fender steel mounting plates. Previously driven 36”...
by admin | Feb 14, 2025
MSF RANGE NORFOLK R6 UPGRADES (EMT REPLACEMENTS) FI & Power & Underwater Construction MSF RANGE NORFOLK R6 UPGRADES (EMT REPLACEMENTS) PROJECT DETAILS PMI conducted a dive survey of the underwater array to gain familiarization with the existing conditions,...